Monday, March 24, 2008

FULL REMODEL #2

Painted walls, ceiling and all trim in entire apartment, installed new ceiling light fixtures, new window blinds, new outlets and outlet covers in entire duplex.

KITCHEN
Removed asphalt tile and linoleum from the floor and laid ceramic tile on the concrete floor, repaired and cleaned kitchen cabinets, did needed plumbing when removing and reinstalling water heater and other appliances, installed a new built-in microwave

BEFORE


AFTER



BATHROOM
Repaired and painted the vanity, removed old medicine cabinet and installed a new one, installed new light fixture, removed the asphalt tile and linoleum and installed new ceramic floor, installed new towel rods and shower rod, had the tub and shower walls refinished

AFTER




BEDROOMS & LIVING ROOM
Removed the carpet and asphalt tile and had carpet installed in the bedrooms, installed new laminate floor in the hall and the living room, repaired and rehung closet doors, installed new door hardware

AFTER





SHEDS
Barn Shed - Put on new roof, repaired doors, replaced rotted trim, and painted shed
White Shed - Replaced rooted 2x4 foundation boards, replaced some 2x4 studs, repaired side wall, built and installed a replacement door, repaired ceiling

BEFORE


AFTER (Shed & Carport)

CARPORTS
Replaced rotted ceiling joists and plywood sub floor, removed old roof and replaced with new "Flintlastic 12 year flat roof", replaced ceiling with vented vinyl ceiling. and replace wrought iron post with white cedar post.

BEFORE



AFTER

CHIMNEYS
BEFORE
Removed old chimney covering and replaced with new aluminum white covering.


AFTER