Sunday, March 16, 2008

PORCELAIN TILE FLOOR

Removed carpet, carpet staples and tack strips from bathroom floor and separate toilet room, evaluated floor to see if "leveler" was needed before applying Hardibacker concrete board with screws to the wood floor, laid out the tile, mortared tile on floor & stairs, laid a special stone on the step wall and at the entrance into the bathroom, grouted joints and used two coats of sealer before the final cleaning.